Estimating Placeholder

Estimating Placeholder

Apartment Complex

Apartment Complex Emeryville, CA – VIATechnik performed quantity take-offs from a “for permit” set of drawings in On-Screen Take-off for architectural, civil, structural, and all MEP work for a 150,000 square foot residential building that also comprised of a basement parking level, 5 apartment floors, and amenity spaces.

read more

Zoo Facility

Zoo Facility Brookfield, IL – Utilizing On-Screen Take-Off, VIATechnik’s quantity engineers produced detailed quantity take-offs for all site and building concrete for two new buildings at one of the nation’s largest zoos.

read more

Winery Renovation

Winery Renovation
Napa, CA – Our knowledgeable, experienced estimating team at VIATechnik provided quantity takeoff services for a leading winery located in Napa, California. Our client required a turnaround time for our estimating services of only two days. Our team focused to create an accurate quantity take-off for the structural steel that was to be added to an existing tank.

read more

Shopping Center & Pavilion

Shopping Center & Pavilion Ankeny, IA – Working closely with the client’s On-Screen Take-Off database of construction items, the VIATechnik team produced quantity take-offs that fit seamlessly into the client’s pricing systems. This saved time on the bid and allowed the client to focus better on pricing with take-offs that they could rely on.

read more

Air Force Base Runway

Air Force Base Runway Little Rock, AR – A complete quantity take-off was performed for the entire scope of work from a 700 page plan set for an air force base runway. The project consisted of the removal and replacement of runway pavement, as well as associated earthwork, civil utilities, electrical upgrades, and striping and traffic protection.

read more

Federal Aid Highway

Federal Aid Highway
McHenry, IL – VIATechnik, through our EstimatingTeam+ service, fast-tracked a take-off estimate for a Federal Aid highway project. The estimating team utilized specialized software to conduct a material take-off for a steel bridge providing the client with a detailed bill of materials. The team also analyzed various road structures and embankments. Take-offs involved reviewing over 500 drawings and providing quantity estimates for over 50 items.

read more

Institutional Housing

Institutional Housing
Monterey, CA – VIATechnik’s estimating expertise ranges from small to large projects. This institutional housing project required a take-off estimate for over 200 housing units with different floor and ceiling plans. Working around the clock, our EstimatingTeam+ marked up drawings, calculated ceiling areas, measured walls, and provided an overall summary that included quantities of various wall types and ceilings.

read more

Lake Michigan Shore Reconstruction

Lake Michigan Shore Reconstruction
Chicago, IL – VIATechnik provided estimating quantity take-off services for a Lake Michigan shore reconstruction project. Our team worked with a heavy civil construction contractor located in the Midwest to provide the civil and structural quantity take-offs for this Chicago based project. The quality estimating quantity-take off was provided on time and within our client’s precise specifications.

read more

Auto Dealership

Auto Dealership
Fremont, CA – ViaTechnik’s EstimatingTeam+ helped a leading interiors subcontractor complete a gypsum board and stud wall quantity take-off for a commercial site in Silicon Valley. Utilizing Autodesk Quantity Take-off, ViaTechnik provided quantities for each type of wall, complete with detailed dimensions for various heights and lengths of wall types. Details including ceiling and floor connections, door framings, and sound insulation completed the project. Through us, the client was able to complete a quality bid for an important client.

read more

Dam Removal/Creek Restoration

Dam Removal/Creek Restoration
Elburn, IL – VIATechnik, through our EstimatingTeam+ service, completed a take-off estimate for a dam removal and creek restoration project. Our team of estimators reviewed excavation requirements, erosion control systems, and flood management specifications. Estimates included varying stone ripraps, riffles, and excavation work.

read more

Riverwalk

Riverwalk
Chicago, IL – VIATechnik conducted a take-off estimate for the Chicago Riverwalk project. Our team of estimators delivered the high quality take-off estimates within the required time frame, allowing our client to evaluate a bid opportunity. Estimates included: sheet pile wall, tie back systems, and concrete caps.

read more

Fitness Facility

Fitness Facility
San Francisco, CA – Our estimators undertook a take-off estimate for a rehabilitated department store being transformed into a fitness facility. VIATechnik conducted the take-off using a computerized software that improved the efficiency of the job. Our scope included walls, ceilings and soffits and the job was completed within the allotted time frame.

read more

Commercial Establishment

Commercial Establishment
Cupertino, CA – VIATechnik’s estimating team provided an estimate for a supermarket shell and tenant improvement. The job required reviewing architectural and structural drawings and the scope covered all walls and ceiling as well as the associated structural elements. Our EstimatingTeam+ delivered the project on time over a holiday weekend, allowing our client to respond to an urgent last-minute bid.

read more