Project Portfolio

Project Portfolio

FILTER CATEGORIES:

Hospital Patient Room
HTC Vive, Oculus, and Leap Motion Controller Compatible - VIATechnik created a completely interactive hospital patient room. Interactive elements include ceilings, lights, movable objects, patient health monitors, and the TV screen. Project utilized a false exterior to give a representative view from the patient room. By creating the patient room in virtual reality, the client did not need to create an expensive mockup.
read more
Powell Street San Francisco
HTC Vive, Oculus, and Leap Motion Controller Compatible - VIATechnik recreated Powell and Ellis Streets in San Francisco with moving Cable Cars. The source data came from a point cloud laser scan, which was then used to guide the 3D geometry. Utilizing photos from the area, VIATechnik recreated storefronts, store interiors, and various elements such as garbage on the street. The immersive world allows one to experience San Francisco from afar!
read more
Nuclear Power Plant
This interactive simulation of a Nuclear Power Plant was featured in ENR Magazine. VIATechnik converted the laser scan of the power plant and transformed it into a completely interactive environment. Users could plan vessel installations and playback planned routes to indicate logistics clashes and risks in not meeting the scheduled installation time frame.
read more
Commercial Office Fit Out
Utilizing hyper-realistic textures and materials, VIATechnik created an immersive loft office space. The modern furnishings included Herman Miller furniture, Apple hardware, and other high end furnishings. These realistic experiences allow decision makers to decide if the space is right for them!
read more
Point Cloud VR
Virtual Reality does not always need to be sexy and highly polished. On this project, VIATechnik brought on a point cloud into a VR environment compatible with the Oculus and HTC Vive. This allowed for a quick turn around to evaluate existing conditions in a retail space.
read more
Bridge Logistics
Why risk real lives and dollars when complex projects can be simulated in virtual reality? Using our logistics simulator, VIATechnik's clients can interact with real construction equipment in virtual reality, record actions, and experience all the challenges on complex jobs without the risks of causing safety issues or lost time.
read more
Construction Logistics
VIATechnik believes that virtual reality is a game changer in planning for construction. Immersive environments that show how projects need to be built limit the delay and safety risks. Utilizing VR logistics has helped our client plan even simple jobs such as high-rise construction.
read more
Hawaiian Golf Club
This environment is both compatible with the Oculus and HTC Vive. This project required the use of simulated audio and changing daylight conditions. The VR simulation allowed the owner to visualize what they were getting.
read more
Japanese Hospital
This project required the integration of the Leap Motion Controller and Oculus. By allowing stakeholders to visualize the end product, decision making for these Japanese patient rooms were sped up and allowed stakeholders to agree on equipment and furnishings remotely, rather than travel to show rooms.
read more
Apartment Building
VIATechnik created this apartment building in virtual reality to convince the owners that the design would meet their expectations when completed. It is much easier to make changes before construction begins.
read more
Apartment Unit Interiors
Sophisticated owners want to see what they are getting before they make investments in their purchases. VIATechnik's VR solution is perfect for offshore sales of real estate.
read more
Tropical Home
This VR environment was created to promote offshore sales of real estate.
read more
Hospital Cryogenic Laboratory
Los Angeles, CA – Our modeling team at VIATechnik converted a laser scan of a large hospital facility into an intelligent BIM model. The modeler meticulously modeled the scan to reflect the as-built conditions of the site. Modeled elements include pipe supports, MEP, lighting and structural components. The job was done on time and within our client’s budget.
read more
Brewery
Brewery | Confidential - VIATechnik converted a high resolution 3D survey (laser point cloud scan) into a Revit model that the client's engineers could use to redesign a massive brewery. The conversion covered hundreds of thousands of square feet and was modeled to an accuracy of 1/4".
read more
Pharmacy and Retailer
Pharmacy and Retailer | Tucson, AZ –A family-owned steel fabricator required detailers to professionally execute steel detailing for shop drawings that included coordination with joists, bollards, gates, structural steel, and a canopy through BIM software.
read more
High-Rise Apartment Building
High-Rise Apartment Building | Chicago, IL - Our VDC experts worked with the client to coordinate electrical conduits, lighting, and other equipment for this 35 storey highrise in the heart of River North in Chicago.
read more
University Research Center
University Research Center | Minneapolis, MN –Top assessment and coordination was put to the test during VIATechnik’s role in completing the reconstruction of a 1 story university building. Work was done up to client standards involving Revit created BIMs from 2D files for the electrical, mechanical ductwork, and mechanical piping trades.
read more
Corporate Headquarters
Corporate Headquarters | Maricopa County, AZ–Through the use of Revit, the engineers at VIATechnik produced BIM modeling efforts for a civil specialty contractor’s first BIM project. Our responsibilities expanded from modeling site utilities, which included fire protection water, domestic water, storm sewer, and sanitary sewer systems to revisions that needed to be done based on clash detection.
read more
Hospital Building
Hospital Building | Coon Rapids, MN – Our dedication to seeing each project fully through lead our team to weekly coordination meetings with the general contractor and subcontractors involved with a 3 story, 58,000 square foot new steel framed hospital building.
read more
Military University Building
Military University Building | Hillsborough County, FL – VIATechnik represented a mechanical subcontractor and electrical subcontractor separately for this project involving a 100,000 square foot multi-level government facility. Our team participated in weekly coordination meetings to clear clashes in over 15 trades from a very dense floor plan.
read more
University Lab Building
University Lab Building | Chicago, IL – Skill and knowledge was brought to the forefront when it came to modeling the electrical work for the 1st floor renovation of a Chicago based university. The BIM included all conduit over ¾” hangers, cable trays, electrical raceways, and light fixtures.
read more
Semiconductor Technology Headquarters
Semiconductor Technology Headquarters | Tempe, AZ – Modeling a BIM in Revit for the plumbing for an ENR Top 50 General Contractor put our engineers to the challenge with a turnover completion time frame of 2 weeks. Plumbing BIM was done for the shell and tenant improvement phases of a corporate headquarters for a semiconductor technology firm.
read more
International School
International School | Chicago, IL – VIATechnik modeled all electrical work for a 2 story new school project, which included lighting, electrical conduit, and cable trays. The BIM was also updated to reflect client redlines and the BIM coordinator’s clash detection/resolution.
read more
Hospital Complex
Hospital Complex | San Diego, CA - The mechanical contract required a mechanical model created for 3D coordination and facilities management. As this job was a renovation, a tremendous amount of coordination was required to ensure a proper fit during construction.
read more
Industrial Chemical Plant
Industrial Chemical Plant | Confidential - VIATechnik utilized Bentley AECOsim to convert a high resolution survey (3D point cloud laser scan) into BIM. The facility included multiple chemical processing rooms, a 14 storey tower, outdoor equipment, and highly specialized mechanical equipment.
read more
Senior Housing and Assisted Living
Senior Housing and Assisted Living | Mokena, IL – Our team had the responsibility of modeling mechanical ductwork, mechanical piping, and fire sprinkler systems of a basement, 3 floors and parking area of a senior housing and assisted living facility. Modeling was done from 2D design drawings for an ENR Top 50 General Contractor.
read more
Medical Facility
Medical Facility | Worcester County, MA – VIATechnik modeled the mechanical ductwork and mechanical piping for a multi-level residential health facility. Coordinating with the commercial general contractor, VIATechnik provided the client with weekly updates to the BIM model and 2D drawings throughout the job.
read more
International Airport Garage
International Airport Garage | Boston, MA - VIATechnik converted over 1,000,000 square feet of CAD drawings issued in 1990 into a Revit model. Trades modeled included civil, site, architectural, structural, mechanical, fire protection, electrical and plumbing.
read more
Natural Gas Facility
Natural Gas Facility Grant County, KS – A drawing group focused to create the accurate structural steel shop drawings need for a new build in an oil and gas facility for a large natural gas company. Our team at VIATechnik worked with the local Texan steel fabricator to deliver the drawings on time and on budget for a successful project development. This natural gas project required attention to detail and precise drawings.
read more
Water Filtration Facility
Water Filtration Facility | Bend, OR – With the aid of 2D design drawings, hand sketches from the general contractor, and plumbing, piping, and insulation submittals, VIATechnik’s Revit specialists quickly and efficiently modeled the plumbing systems for a 24 million dollar water improvement project within a week’s deadline.
read more
Water Utility Pumping Station
Water Utility Pumping Station | Portland, OR - VIATechnik's VDC team modeled civil, site, architectural, structural, electrical, mechanical, and fire protection trades at one of the major water pumping stations in Oregon. The model was then used to plan construction and identify any site issues.
read more
Corporate Campus Building
Corporate Campus Building | Confidential - This corporate campus new construction required a clash report to identify issues across trades. VIATechnik brought various models into Navisworks to run a clash analysis and segment clashes by trade, floor, and zone.
read more
8 Storey Hotel Complex
8 Storey Hotel Complex | Madison, WI – Based off hand sketched construction logistics plans provided by the contractor’s superintendent, our expert modelers created an original 3D model that was rendered in Sketchup for a new building construction project, as well as the modeling of other construction logistics items that included trailers, fencing and concrete barriers.
read more
Luxury Residence
Luxury Residence | Los Angeles, CA - A real estate developer in Los Angeles brought on VIATechnik to help his team visualize proposed property developments in the area. VIATechnik created the 3D model from hand sketches and rendered them based on client specifications.
read more
Public-Private Hospital
Public-Private Hospital | Anchorage, AK - Our rendering team assisted the client during their business development phase. Through the guidance of the client BD team, the team put together a 3D model and rendering of a large new construction hospital.
read more
Data Center
Data Center | Confidential - VIATechnik worked with a leading general contractor to convert a 3D point cloud scan into a Revit model. The data center consisted of very tight spaces, multiple piping layers, ground mounted equipment, and custom ducting and piping.
read more
Recreational Visitor Center
Recreational Visitor Center Branson, MO – The professionals experienced in working with Bentley AECOsim here at VIATechnik worked with a Hawaiian based company that specializes in energy, power, and government projects to create the newest recreational visitor center overlooking a dam located in Missouri. Our team created an LOD 300 BIM model to include structural, architectural, mechanical, electrical, plumbing, and civil disciplines for the project.
read more
Convention Center
Convention Center Albuquerque, NM – The focused 3D modeling group at VIATechnik worked to accurately create a model for the HVAC requirements in a large government convention center. The team worked with the needs of a mechanical contractor to create the MEP coordination drawings needed for the convention center. Our team located clashes using the latest innovative clash software and the clashes were fixed with proper solutions applied to the project.
read more
Regional Branch Construction
Regional Branch Construction Marshall, TX – The focused and accurate group at VIATechnik created structural steel shop drawings required for a large bank located in Texas. The bank’s retail space spanned 10,000 sq ft and our team provided the accurate, timely steel shop drawings that met our client’s expectations. Our accuracy and knowledge in steel shop drawings enabled our client to stay on course for the scheduling, material, and planning specifications.
read more
Sugar Processing Facility
Sugar Processing Facility Moorehead, MN – A sugar manufacturing facility required structural steel shop drawings for the structural steel addition at the main plant. Our team worked with a large North Dakota steel fabricator to complete the specific requirements for the addition of the large centrifuge. Our services were successfully delivered to complete the project development goals.
read more
Luxury Apartment
Luxury Apartment Middletown, NY – Shop drawings were required by a real estate developer that provides its own construction team to develop each luxury residence equipped with resort style amenities. The knowledgeable team at VIATechnik worked to create the structural shop drawings for the various members in the multiple levels of structural beams and columns that covered over 25,000 ft of this breathtaking new community.
read more
Oil and Gas Facility
Oil and Gas Facility Cortez, CO – Our professional drawing team at VIATechnik worked to create accurate steel shop drawings for an oil and gas terminal in Texas. The group in charge of this project worked with a large Texan steel fabricator to provide accuracy in the inception of the design for one of the largest oil and gas pipeline companies in the nation.
read more
Hydroelectric Dam
Hydroelectric Dam Folsom, CA – The drafting team is always ready to accept a challenge. Utilizing 2D design drawings, VIATechnik was tasked to build a 3D model of a proposed dam within days of the contractor’s request. Using our civil drafting team, the company built a 3D model and rendered an artist’s image of the dam with different water levels.
read more
Convenience Store
Convenience Store Commerce City, CO – VIATechnik provided a family owned company in Colorado the accurate shop drawings for the bollards, gates, and canopy needed to begin construction on a large retail convenience store. This 10,000 sq ft project required our team to meet the client’s precise specifications and deadline in order to meet the project goals and successful, accurate completion of the structural work.
read more
High End Restaurant
High End Restaurant Austin, TX – Our professional team at VIATechnik collaborated with a family owned fabrication company located in Texas to begin construction for a popular restaurant chain. Accurate and timely drawings were required for many different types of architectural elements in this pleasing design. Architectural elements included drawings for various steel elements such as rails, stairs, and bollards. Work was created within the required time frame and on budget.
read more
Police Building Renovation
Police Building Renovation Allen, TX – Our knowledgeable and experienced team at VIATechnik created the shop drawings needed to develop this Texas police station. Our team collaborated with a family owned fabricator located in Texas to create the structural shop drawings consistent with the particular requirements in materials, time, and budget for the new police station. Our team accurately identified goals and created the drawings to effectively meet the requirements for development.
read more
Golf Club and Spa
Golf Club and Spa | Kailua, HI – Undertaking a uniquely designed multi-building complex, VIATechnik’s engineering team modeled structural, architectural, mechanical, electrical, plumbing and fire protection for the entire facility. 21 different trades were involved with the original design of the project.
read more
Top Tier School
Top Tier School Chicago, IL – A large private school located in Chicago, Illinois was undergoing extensive renovations which required the focused support from the team at VIATechnik. Our professionals went to work on the renovation which required the electrical systems to be coordinated across multiple trades. VIATechnik provided a leading electrical contractor with the 3D model of the electric systems for the large school on time and with the budget needs in mind.
read more
Water Pollution Control Plant
Water Pollution Control Plant Los Angeles, CA – This project required the team of VIATechnik to consider the distinct needs of a large metropolitan water utility. Our team worked to create the shop drawings for many types of machine parts vital to the 60 water pollution control tanks at the facility. Our team created a cohesive plan that involved coordinating the use of the existing infrastructure in the facility. Our precise component dimensions in the drawings were vital to fulfill the requirements for one of the largest water utilities in the Unites States.
read more
Healthcare Facility
Healthcare Facility Manchester, NH – Our team at VIATechnik worked the general contracting to create a 3D model for the coordination of all of the essential needs in a Veteran’s hospital The professionals here worked to coordinate the essential needs in the mechanical, electrical, plumbing, utility lines, and safety aspects of the project.
read more
Catholic Church Expansion
Catholic Church Expansion Denver, CO – VIATechnik was asked to create the structural shop drawings for a local parish in Boulder, Colorado. Our team created the drawings for the beams, columns, and angles in this beautiful and artistic church’s design. Our team overcame challenges in the realm of undefined dimensions and at times incorrect dimensions. The group was able to compensate to create the accurate, finished drawings to enable the success for the next phase in building the church.
read more
Global School
Global School Palo Alto, CA – A large private school located in Palo Alto required shop drawings to create a project with multi-faceted updates. The team at VIATechnik worked to create a cohesive design that incorporated the existing structure with the new goals of earthquake resistant structural elements.
read more
Large Pharmacy Chain
Large Pharmacy Chain Tucson, AZ – The team at VIATechnik completed shop drawings for a pharmacy and large retailer in Arizona. The project involved creating shop drawings for 10,000 sq ft store space and additional mezzanine levels. VIATechnik fulfilled the specific needs of the project that required drafters working in the same time zone to enable the coordinated projects on the other trades and many miscellaneous items involved.
read more
Oil and Gas Terminal
Oil and Gas Terminal Fairless Hills, PA – A knowledgeable and experienced team was assembled to meet the particular requirements of the steel detailing for the creation of a large Oil and Gas Company’s terminal. The terminal required structural steel shop drawings for the pipeline supports and our team worked with a large east coast steel fabricator to make it happen. The project required coordinating work with multiple detailing teams.
read more
Public Library
Public Library Los Angeles, CA – Our innovative team at VIATechnik focused to create an accurate 3D model rendering for this curtain wall project to service a public library. This large library needed a model to encompass everything required in this unique project including glazing and unique dimensions – everything down to the bolts.
read more
Oil Refinery
Oil Refinery Goliad Co, TX – The experienced team at VIATechnik worked to create structural steel shop drawings on time and on budget in this oil & gas project. Our group created the drawings for the oil and gas platforms as well as the structural supports for one of the largest oil and gas pipeline companies in the nation.
read more
Government Facility
Bibb County, GA – VIATechnik’s skilled engineering team assisted the contractor with drawing changes resulting from close to 200 RFIs involving a multi-building project that housed a training facility, maintenance shop, and storage facility.
read more
Botanic Garden
Chicago, IL – OurAutoCAD engineers serviced a civil contractor with civil, landscaping, and structural CAD As-Builts that revolved around a shoreline restoration on the north lake of a 385 acre botanic garden site.
read more
Landfill Electrical Generation
Munster, IN – With the help of our AutoCAD team, VIATechnik drafted all as-built changes onto a landfill gas facility’s original “for construction” drawings.
read more
Storm System Substation
Griffith, IN – VIATechnik performed Microstation drafting services for a project that was part of general storm sewer and flood protection efforts enlisted by a federal agency teaming with local city officials.
read more
Six Flags Roller Coaster
Gurnee, IL –VIATechnik’s Civil Engineering drafters teamed up with a Chicago based construction firm specializing in unique and challenging infrastructure projects to complete the design drawings for a custom earth retention system for Six Flags Great Amercia’s new Goliath Roller Coaster.
read more
Luxury Retail Concept Store
New York, NY – VIATechnik worked with a glazing contractor to fulfill the needs for a top-secret concept for a large luxury women’s retailer. The particular materials to be used in the glazing were new to this location’s storefront design and our team provided the updated store front shop drawings.
read more
Regional Branch Construction
New York, NY – Our professional group at VIATechnik provided assistance in conjunction with a glazing company for a top five bank in the United States. Our team was required to create drawings for the existing branch that was undergoing renovation.
read more
Dam Construction
Fall Creek, OR – Through the use of AutoCAD and Microstation, our drafters created professional construction drawings from sketches and redlines provided by the contractor. Assistance was also given on a variety of other construction phase drafting needs that included logistics and coordination plans.
read more
Sewer Improvement
Chicago, IL – Working with the earth retention contractor and their professional structural engineer, VIATechnik’s CAD drafters helped devise construction drawings of a sheet pile earth retention system.
read more
Performing Arts Center
Miami, FL – VIATechnik’s AutoCAD experts created fabrication shop drawings of all acoustical panels. This project, which involved acoustical panel shop drawings for a performing arts center, was the most high profile and unique acoustical panel project in the company’s history.
read more
Commercial High-Rise
Fresno, CA – After an initial inability from the original steel subcontractor to meet the demands of the GC, the experienced team at VIATechnik was called in to fulfill the needs in CAD drafting to redraft steel shop drawings. Our group worked on CAD to redraft the erection drawings, the shop drawings, the individual piece drawings and details as well as the bill of material. Our group completed the task on time for the general contractor, enabling a successful project.
read more
Light Demolition Range
Washington, DC – ViaTechnik’s AutoCAD experts drafted the as-built construction documents on a 175 acre government facility in Washington DC. Working with the native DWG files, ViaTechnik converted the contractor’s redline drawings into AutoCAD and PDF format. Changes include site utility re-designs, structural modifications, and civil and landscaping site upgrades.
read more
Queens NY Play Yard
New York, NY - The team on this project created shop drawings for hundreds of unique parts that were used to enclose a rooftop play yard.
read more
Global Bank Headquarters
New York, NY – A top U.S. bank required the professional team at VIATechnik to create the curtain wall glazing drawings for their global bank headquarters. Our team needed to compensate and develop the drawings to repair the damage done during Hurricane Sandy. The dimensions provided did not match the original design drawings which required our team to field survey to finish the project accurately.
read more
Clay Dike
East Chicago, IN – ViaTechnik’s experienced engineers and drafters completed the As-Builts for the general contracting team on a dike construction project in Indiana. ViaTechnik compiled all construction changes, including RFIs and field sketches, and modified the original contract drawings to reflect the final construction conditions. Following the strict drafting and quality standards, the as-builts were completed in Bentley Microstation.
read more
Aviation Facility
Santa Rosa County, FL – With VIATechnik’s team’s expertise across a variety of CAD platforms, we are able to quickly convert AutoCAD, Microstation, and PDF files to our clients’ desired formats. On a large scale $200M construction project, VIATechnik quickly plotted over 3,200 CAD files. We corrected scaling errors and non-standardized page layouts from the original CAD files to ensure that the final drawing set met the client’s strict specifications and requirements.
read more
Concrete Pad
Ozarks, MO – VIATechnik’s team of experienced drafted construction modifications onto the original design drawings for an industrial equipment operator training facility. Changes included over 50 different civil, landscaping, and utility changes. The client required that the field changes be clearly delineated from the original design, and as such, VIATechnik created new layers in our CAD model to ensure that all modifications were properly tracked.
read more
Government Facility
San Antonio, TX – The professional team at VIATechnik provided Bentley experience to create the CAD as-builts required to create several government facilities for a project including a training facility, a parking garage, and many infrastructure improvements on site. Our group worked with a contractor to meet the client’s expectations in creating a draft using Bentley Microstation. We changed over five-hundred plans using our dedicated expert team for a quick turnaround.
read more
High-end Clothing Retailer
Dallas, TX – Shop drawings for steel and glazing was required for a top U.S. clothing store and VIATechnik was sourced for this project. Our team worked with a Texan construction company and provided the shop drawings needed to create the glazing and structural steel needed to begin the project on time. The project’s shop drawing was accurate and included all specifications required by this large clothing retailer.
read more
Government Facility
Macon, GA – VIATechnik provided Microstation v8i CAD as-builts for government owned buildings including a training facility, a maintenance shop, and a storage facility. Our team worked on this joint venture between two of the largest government contractors in the Unites States.
read more
Public High School
Chicago, IL – VIATechnik’s CAD team, experienced in MEP drafting, drafted drawings for an electrical contractor on a Chicago Public Schools project. ViaTechnik drafted changes to conduit runs, electrical wiring, lighting controls, and electrical equipment locations to reflect the electrical contractor’s field changes.
read more
Luxury Shoe Retail
New York, NY – VIATechnik provided curtain wall drawings for a top 50 US retailer. The retailer was renovating the company’s headquarters and required the curtain wall glazing system to give the building modern updates. Our team worked to create a sleekly designed curtain wall glazing system for this luxury shoe retailer on time and within budget requirements.
read more
Sports Facility
New York, NY – VIATechnik provided curtain wall glazing system drawings for a city sports and recreation department’s sports facility. Our team created a drawing for multiple floors of curtain wall and glazing systems in this project. Special consideration was required for the project due to the high winds in the area and the stability needed in the final construction plan.
read more
Vehicular Wash Facility
Oahu, HI – ViaTechnik drafted the as-built construction drawings for a multi-building equipment & vehicle wash facility in Oahu, Hawaii. Utilizing Bentley Microstation, ViaTechnik’s engineers modified the For Construction drawings to reflect actual conditions built at the project site. The general contractor supplied ViaTechnik with construction photographs and field sketches of changes to the building as well as the structural and drainage systems, which our Microstation drafters translated into CADD.
read more
Miscellaneous Metals
Clearlake, CA – VIATechnik provides shop drawing services to small and large jobs. We work with the client to meet their CAD detailing standards. This job involved miscellaneous metals for a hospital facility in California. Using CAD software, our detailers drafted the fabrication, erection and anchor bolt plans of the miscellaneous metals.
read more
AC Armature Winding Diagram
Columbus, OH – Using AutoCAD, ViaTechnik drafted a coil winding diagram for an electrical generator for a US-based electrical manufacturing company. ViaTechnik converted a PDF of a hand drawn winding diagram into CAD and then modified the CADD file to meet the manufacturer’s specifications for layering, coloring, and detailing. ViaTechnik was able to turn around this project to meet the client’s strict time needs in order for them to meet their manufacturing deadlines.
read more
Apartment Complex
Apartment Complex Emeryville, CA – VIATechnik performed quantity take-offs from a “for permit” set of drawings in On-Screen Take-off for architectural, civil, structural, and all MEP work for a 150,000 square foot residential building that also comprised of a basement parking level, 5 apartment floors, and amenity spaces.
read more
Zoo Facility
Zoo Facility Brookfield, IL – Utilizing On-Screen Take-Off, VIATechnik’s quantity engineers produced detailed quantity take-offs for all site and building concrete for two new buildings at one of the nation’s largest zoos.
read more
Winery Renovation
Winery Renovation Napa, CA – Our knowledgeable, experienced estimating team at VIATechnik provided quantity takeoff services for a leading winery located in Napa, California. Our client required a turnaround time for our estimating services of only two days. Our team focused to create an accurate quantity take-off for the structural steel that was to be added to an existing tank.
read more
Shopping Center & Pavilion
Shopping Center & Pavilion Ankeny, IA – Working closely with the client’s On-Screen Take-Off database of construction items, the VIATechnik team produced quantity take-offs that fit seamlessly into the client’s pricing systems. This saved time on the bid and allowed the client to focus better on pricing with take-offs that they could rely on.
read more
Air Force Base Runway
Air Force Base Runway Little Rock, AR – A complete quantity take-off was performed for the entire scope of work from a 700 page plan set for an air force base runway. The project consisted of the removal and replacement of runway pavement, as well as associated earthwork, civil utilities, electrical upgrades, and striping and traffic protection.
read more
Federal Aid Highway
Federal Aid Highway McHenry, IL – VIATechnik, through our EstimatingTeam+ service, fast-tracked a take-off estimate for a Federal Aid highway project. The estimating team utilized specialized software to conduct a material take-off for a steel bridge providing the client with a detailed bill of materials. The team also analyzed various road structures and embankments. Take-offs involved reviewing over 500 drawings and providing quantity estimates for over 50 items.
read more
Institutional Housing
Institutional Housing Monterey, CA – VIATechnik’s estimating expertise ranges from small to large projects. This institutional housing project required a take-off estimate for over 200 housing units with different floor and ceiling plans. Working around the clock, our EstimatingTeam+ marked up drawings, calculated ceiling areas, measured walls, and provided an overall summary that included quantities of various wall types and ceilings.
read more
Lake Michigan Shore Reconstruction
Lake Michigan Shore Reconstruction Chicago, IL – VIATechnik provided estimating quantity take-off services for a Lake Michigan shore reconstruction project. Our team worked with a heavy civil construction contractor located in the Midwest to provide the civil and structural quantity take-offs for this Chicago based project. The quality estimating quantity-take off was provided on time and within our client’s precise specifications.
read more
Auto Dealership
Auto Dealership Fremont, CA – ViaTechnik’s EstimatingTeam+ helped a leading interiors subcontractor complete a gypsum board and stud wall quantity take-off for a commercial site in Silicon Valley. Utilizing Autodesk Quantity Take-off, ViaTechnik provided quantities for each type of wall, complete with detailed dimensions for various heights and lengths of wall types. Details including ceiling and floor connections, door framings, and sound insulation completed the project. Through us, the client was able to complete a quality bid for an important client.
read more
Dam Removal/Creek Restoration
Dam Removal/Creek Restoration Elburn, IL – VIATechnik, through our EstimatingTeam+ service, completed a take-off estimate for a dam removal and creek restoration project. Our team of estimators reviewed excavation requirements, erosion control systems, and flood management specifications. Estimates included varying stone ripraps, riffles, and excavation work.
read more
Riverwalk
Riverwalk Chicago, IL – VIATechnik conducted a take-off estimate for the Chicago Riverwalk project. Our team of estimators delivered the high quality take-off estimates within the required time frame, allowing our client to evaluate a bid opportunity. Estimates included: sheet pile wall, tie back systems, and concrete caps.
read more
Fitness Facility
Fitness Facility San Francisco, CA – Our estimators undertook a take-off estimate for a rehabilitated department store being transformed into a fitness facility. VIATechnik conducted the take-off using a computerized software that improved the efficiency of the job. Our scope included walls, ceilings and soffits and the job was completed within the allotted time frame.
read more
Commercial Establishment
Commercial Establishment Cupertino, CA – VIATechnik’s estimating team provided an estimate for a supermarket shell and tenant improvement. The job required reviewing architectural and structural drawings and the scope covered all walls and ceiling as well as the associated structural elements. Our EstimatingTeam+ delivered the project on time over a holiday weekend, allowing our client to respond to an urgent last-minute bid.
read more
Overseas Government Facility
Overseas Government Facility Burkina Faso – Our experienced group at VIATechnik worked on a project located overseas with over 1,000 scheduled activities over a three year construction schedule. This required collaboration with all teams involved and our focused team created the scheduling forensics needed to analyze the effects of several delays on the critical path. We were able to determine the responsible party and create the organization needed in general contracting for a successful project.
read more
Rehabilitation of Two Pumping Stations
Rehabilitation of Two Pumping StationsWoonsocket, RI – Our construction engineers wrote the Accident Prevention Plan for USACE’s rehabilitation of two pumping stations. The rehabilitation work included significant asbestos remediation and, therefore, a detailed plan of attack.
read more
Water Structure
Water StructureRomeoville, IL - Utilizing Primavera P6, our team of experts created a Critical Path Method Schedule, which included monthly updates of actual/as-built information for an underwater structure with concrete foundations and electrode installations that also included a master fish barrier project.
read more
Piers Structural Repair
Piers Structural RepairNorfolk, VA – VIATechnik completed the initial baseline schedule, monthly updates, and schedule reporting for this pier repair project. The overall schedule consisted of more than 300 tasks including underwater activities, demolition, vessel mobilization, and pile installation. All scheduling was completed in Primavera P6.
read more
International Airport Terminal
International Airport TerminalChicago, IL – For one of the largest airports in the world, VIATechnik’s scheduling team coordinated an initial schedule and monthly updates with the airport representatives, engineers, and contractor for a roof replacement project of an entire terminal.
read more
Water Main Replacement
Water Main ReplacementChicago, IL – VIATechnik wrote the quality control plan for USACE’s replacement of a key water main in Chicagoland. During and after the installation, deflection, leakage, and exfiltration tests were completed to ensure a high quality of installation.By working closely with the contractor on this project, we were able to create a plan that reflected their overall strategy for the job.
read more
Simulation Facility
Simulation FacilityConfidential - VIAtechnik’s experienced staff of construction professionals wrote the Quality Control Plan for this multi-million dollar military simulator facility installation. This project included almost 20 definable features of work, ranging from micropiles to monorail hoists as well as multiple testing and inspection procedures such as static and dynamic hoist tests and weld inspections.
read more