Project Administration Portfolio

From LEED to scheduling, VIATechnik works closely with project controls and administration teams to support field operations. Our scheduling expertise utilizes a range of tools, from lean pull planning, to risk analysis to better enable decision making. Our LEED support provides teams with documentation and compliance support to help projects get LEED certified quicker and more cost effectively.

Overseas Government Facility

Overseas Government Facility
Burkina Faso – Our experienced group at VIATechnik worked on a project located overseas with over 1,000 scheduled activities over a three year construction schedule. This required collaboration with all teams involved and our focused team created the scheduling forensics needed to analyze the effects of several delays on the critical path. We were able to determine the responsible party and create the organization needed in general contracting for a successful project.

read more

Rehabilitation of Two Pumping Stations

Rehabilitation of Two Pumping StationsWoonsocket, RI – Our construction engineers wrote the Accident Prevention Plan for USACE’s rehabilitation of two pumping stations. The rehabilitation work included significant asbestos remediation and, therefore, a detailed plan of attack.

read more

Water Structure

Water StructureRomeoville, IL – Utilizing Primavera P6, our team of experts created a Critical Path Method Schedule, which included monthly updates of actual/as-built information for an underwater structure with concrete foundations and electrode installations that also included a master fish barrier project.

read more

Piers Structural Repair

Piers Structural RepairNorfolk, VA – VIATechnik completed the initial baseline schedule, monthly updates, and schedule reporting for this pier repair project. The overall schedule consisted of more than 300 tasks including underwater activities, demolition, vessel mobilization, and pile installation. All scheduling was completed in Primavera P6.

read more

International Airport Terminal

International Airport TerminalChicago, IL – For one of the largest airports in the world, VIATechnik’s scheduling team coordinated an initial schedule and monthly updates with the airport representatives, engineers, and contractor for a roof replacement project of an entire terminal.

read more

Water Main Replacement

Water Main ReplacementChicago, IL – VIATechnik wrote the quality control plan for USACE’s replacement of a key water main in Chicagoland. During and after the installation, deflection, leakage, and exfiltration tests were completed to ensure a high quality of installation.By working closely with the contractor on this project, we were able to create a plan that reflected their overall strategy for the job.

read more

Simulation Facility

Simulation FacilityConfidential – VIAtechnik’s experienced staff of construction professionals wrote the Quality Control Plan for this multi-million dollar military simulator facility installation. This project included almost 20 definable features of work, ranging from micropiles to monorail hoists as well as multiple testing and inspection procedures such as static and dynamic hoist tests and weld inspections.

read more