VIATechnik Creates Intelligent 3D Model for Reconstruction of Cedars-Sinai Steven Spielberg Building

Point cloud to BIM conversion creates digital intelligent model to completely rebuild first floor while rest of building operates as normal.

CHICAGO, Oct. 9, 2014 – VIATechnik has partnered with Los Angeles’ Cedars-Sinai Medical Center and LCS Constructors, Inc. on a reconstruction project of the Steven Spielberg Building. Construction is nearing completion on this cryogenic lab and storage facility. The space has been transformed to include 80 liquid nitrogen freezers with chilled beams, as well as cutting edge research and laboratories.

BIM "before" model of Cedars Sinai project, VIATechnik (PRNewsFoto/VIATechnik)

Using state-of-the-art point cloud scans, VIATechnik was able to assess the building’s existing layout and systems while allowing business to operate as usual on the upper three stories of the building as the ground floor was completely renovated.

BIM "complete" model of Cedars Sinai project, VIATechnik (PRNewsFoto/VIATechnik)

A Leica C10 scanner was utilized to take accurate scans of the existing structure, HVAC, plumbing and electrical systems within the building. VIATechnik then compiled the information into a 3D BIM (Building Information Modeling) utilizing Autodesk Recap and Revit. Once the Revit model of the existing systems was completed, VIATechnik engineers created BIMs for the all the new mechanical, plumbing, electrical and fire protection systems based on the designer’s 2D drawings.

“Due to the density of the existing systems, as well as the uniqueness of some of the systems such as acid waste, liquid nitrogen piping, or medical gas, we felt that it would be important to create an intelligent BIM that identified each type of pipe or duct.  To obtain this information, we took photos with the point cloud scan to give a true color 3D point cloud,” says President and Co-Founder of VIATechnik, Danielle Dy Buncio.

“The challenge was in coordinating the new construction work around the rest of the building, of which three floors above had to stay fully operational for the safety and care of the hospital patients,” continued Dy Buncio.

Time was of the essence in this project and due to the strict construction timeline, the initial cloud point scans were completed in one day, with the existing model completed in one week. The VIATechnik team was able to complete the entire modeling project in just one month so that an initial coordination effort could be achieved prior to MEP construction.

The value of the BIM provided by VIATechnik goes beyond the typical construction coordination. Carey Collier, Project Manager for LCS Constructors explains further, “We are using the BIM for our construction as-builts and Cedars-Sinai really likes that.”

To be able to turn over an accurate and intelligent model to the client has immense value – from utilizing that model for future construction efforts, to inputting facility management information.

Additional services VIATechnik offers:

  • 2D CAD and 3D BIM Services
  • LOD 100-500 BIM
  • 4D BIM (Scheduling), 5D BIM (Quantity & Costs), and 6D BIM (Facilities Management) Point Cloud to BIM
  • Construction Logistics and Phasing Plans
  • 3D Renderings

VIATechnik personnel are experienced in software platforms such as Autodesk Revit, Bentley AECOsim, Leica Cloudworx, Tekla, SketchUp, 3ds Max and others.

Enabling Automation in The Built Environment

Enabling Automation in the Built Environment The building and construction industry is primed for automation. The automatic manufacturing of the “stuff” of a building – the parts and pieces that …

The Construction Industry Has a Problem, and Women are Going to Solve It

  The 8-trillion dollar construction industry has a major problem. Simply put, we do not have enough people to meet construction demands worldwide. A recent study by Autodesk and the …

How VIATechnik is Promoting Mass Timber Construction with BIM

The world’s population is booming. According to the United Nations Department of Economic and Social Affairs, urban areas will welcome 2.5 billion new residents by 2050. In addition to requiring …

Gehry’s CATIA in the Age of Computational Design

How On Earth Would You Build That? When the Canadian-born American architect Frank Gehry designed Peix—the fish-shaped sculpture commissioned for Barcelona when it hosted the 1992 Olympics—his team had to …

Prefab and VDC are a match made in heaven

Why you should embrace prefab and VDC, and how it could save the industry’s future When it comes to using prefabrication technology in the industry, we’re facing the same issues …